Who is Constellation Energy Consorting With?
Get to know Electricite de France (EDF) and AREVA March 2009
At What Cost: Why Maryland Can’t Afford A New Reactor March 2009
The Brave New World of Nuclear Power Economics, a new article by NIRS executive director Michael Mariotte September 5, 2008
New Greenpeace International factsheet on numerous problems with Areva’s European Pressurized Reactor (EPR), which is being proposed for Calvert Cliffs, MD and other sites in the U.S. June 2008
New Greenpeace International factsheet on construction problems with Areva’s EPR at Flamenville, France. June 2008
You Think There’s a Lot of High-Level Radioactive Waste Stuck at Calvert Cliffs Right Now? How about Twice as Much?! March 18, 2008
Greenpeace Finland factsheet on Areva's EPR reactor (same
design as Calvert Cliffs) now being built in Finland.
March 3, 2008
Living in the Zone. December 10, 2007
Maryland Can’t Afford A New Nuclear Reactor. December, 2007
A Brief on Incidents at the Calvert Cliffs Nuclear Power Plant. November, 2007
The High Cost of Nuclear Power: Why Maryland Can’t Afford a New Reactor. March 2007 |